Fall Shutdown Schedule
Below is the fall shutdown schedule. The pool will be open and heated through the end of the day on Sunday, September 10.
- Pool closes 9/10, shutdown 9/14
- Docks out 10/7/23
- Water off to sites 10/15/23
- Fall clean up 10/21/23
- Water off to shower house 10/28 or as weather dictates
- Garbage service suspended after 10/27/23 pick-up
- Wi-Fi speed turned down 10/30/23
Volunteers will be needed to help with the docks, water off to the sites, and fall clean up. If you can help please let the board of directors know.