Day Four
Day four brought the completion of the work by the entrance and the driveway. It looks like the electrical work is still in progress in this area. Digging has started behind the Gathering Room to install the last tank (towards the end of the video you can see the excavator moving over the back right corner of the Gathering Room). Unfortunately the had to disconnect the power in that area so the camera feeds from the overflow lot are down.



